VDW Double Head Drilling
Slim pile walls can be constructed with the VdW system (front of the wall system) directly adjacent to existing structures. Drill casing and auger are drilled into the ground simultaneously by two rotary drives rotating in opposite directions. Main applications are the construction of intermittent or secant pile walls or the installation of temporary cased foundation piles.
